Demo
SEWA Grade 1 Electrical Contractor in Hamriyah Free Zone
Midas Electromechanical Contracting is a SEWA Grade 1 electrical contractor registered in Hamriyah Free Zone, delivering the complete electrical scope for industrial plots in the zone, from the SEWA application and drawing approval through LV distribution, machinery power and yard lighting to inspection and energisation. Wilmington Foods, Reliable Engineering FZC and DBMSC Steel are among the HFZA tenants whose electrical works we have delivered, and the Midas group has completed more than 100 facilities in Hamriyah Free Zone since 2003.
If you are setting up a new plot, expanding an existing one, or moving a generator-powered facility onto the SEWA network, this page explains how the work runs in Hamriyah Free Zone and what Midas handles for you.
SEWA power for a Hamriyah Free Zone plot
Hamriyah Free Zone is supplied by the Sharjah Electricity, Water and Gas Authority (SEWA). Every plot that wants a permanent supply, a larger supply, or a temporary supply during construction goes through SEWA’s engineering approval process, and only a SEWA-approved electrical contractor can submit the drawings, book the inspections and sign off the installation for energisation. Midas holds Grade 1, the highest SEWA contractor grade, so there is no load ceiling that would force a tenant to change contractor partway through a project.
Three situations account for most of the electrical work we do in the zone:
New connections for new plots
Load assessment, single-line diagram, LV distribution drawings and the SEWA engineering approval submission, followed by the LV room build, cabling and switchgear, SEWA inspection and meter installation
Load increases for expansions
When a tenant adds a production line, a crane bay or a cold store, the existing supply usually needs to be increased. Midas prepares the load increase application and drawings, modifies the LV room and distribution, and coordinates the SEWA inspection so the additional capacity is released on time. See our guide to SEWA power upgrades and load increases.
Temporary supply during construction.
A temporary SEWA connection for site works, converted to the permanent supply at completion.
One point that matters for budgeting and programme: SEWA installs the transformer. There is no contractor coordination on the HV side. Everything from the transformer room onward, the LV panels, cabling, distribution boards and final circuits, is Midas’s scope as the LV contractor. The SEWA connection charges are paid by the tenant directly to SEWA; our SEWA connection fees guide sets out what to expect. For the full approval sequence, read how the SEWA engineering approval process works.
What we install
Our electrical scope for Hamriyah Free Zone plots covers:
LV rooms and main distribution boards
Design, supply and installation of main LV panels, bus-bar systems and metering sections built to SEWA requirements.
Sub-mains and distribution panels
Cable containment, sub-main cabling and distribution boards for production halls, warehouses, offices and ancillary buildings.
Machinery and crane power
Dedicated feeders, motor control centres, starters and isolators for production lines, overhead cranes and gantry systems. Our current works for DBMSC Steel's crane yard expansion in Phase 2 are a live example.
Yard and high-mast lighting
Dedicated feeders, motor control centres, starters and isolators for production lines, overhead cranes and gantry systems. Our current works for DBMSC Steel's crane yard expansion in Phase 2 are a live example.
Earthing and lightning protection
Earthing systems, equipotential bonding and lightning protection to the applicable standards and SEWA inspection requirements.
ELV and low-current systems
CCTV, access control, structured cabling and intercom, installed alongside the power scope so there is one contractor on site.
HFZA EHS and SEWA inspections
Electrical works in Hamriyah Free Zone are inspected twice over. SEWA inspects the LV installation before energisation. The Hamriyah Free Zone Authority’s EHS department runs its own approval and inspection layer on top, covering the site during construction and at completion.
Midas handles both. We prepare the SEWA submission package (single-line diagram, LV distribution layout, cable schedules, earthing schematic and switchgear drawings), attend the SEWA inspection and close out any comments, and prepare the documentation HFZA EHS requires for the electrical scope.
Because Midas is also Sharjah Civil Defence approved for fire alarm and fire fighting, the same team can carry the fire alarm power supply, pump room supply and AMAN connection through the Civil Defence inspection, so the electrical and fire approvals are coordinated rather than handled by two contractors who never meet.
SEWA power for a Hamriyah Free Zone plot

Wilmington Foods.
Automated food processing plant, Hamriyah Free Zone. SEWA approvals and connection, LV distribution and power for the production and automation systems.

Reliable Engineering FZC
Engineering and fabrication facility, Hamriyah Free Zone. Electrical works including LV distribution and workshop power.

DBMSC Steel
Steel stockyard, Hamriyah Free Zone Phase 2. LV distribution, crane feeds and yard lighting for the original facility; full MEP and fire fighting for the crane yard expansion now under way.
Also in Hamriyah Free Zone
Midas delivers the complete MEP package for HFZA plots. See MEP contractor in Hamriyah Free Zone for HVAC, plumbing and the full scope, fire fighting contractor in Hamriyah Free Zone for fire system design and installation, and fire system AMC in Hamriyah Free Zone for annual maintenance and Civil Defence certificate renewal. For electrical works elsewhere in the emirate, see our SEWA Grade 1 electrical contractor in Sharjah page.
Frequently asked questions
Are you a SEWA Grade 1 contractor registered in Hamriyah Free Zone?
Yes. Midas Electromechanical Contracting holds SEWA Grade 1 electrical contractor registration, the highest grade SEWA issues, and is registered with the Hamriyah Free Zone Authority to carry out works in the zone.
Can you apply to SEWA on behalf of a Hamriyah Free Zone tenant?
Yes. As a SEWA-approved contractor we prepare and submit the engineering approval application, the drawings and the load schedule on your behalf, attend the inspections and arrange energisation. You pay SEWA’s connection charges directly; we handle everything else.
How long does a new SEWA connection for a Hamriyah plot take?
It depends on the load applied for, the completeness of the first submission, SEWA’s transformer and metering programme, and whether civil works are needed for the LV room. A complete submission from a Grade 1 contractor avoids the resubmission cycles that cause most delays. Send us your plot details and intended load and we will give you a realistic programme for your connection.
Can you increase our supply without a shutdown?
In most cases, yes. The application, drawings and new LV distribution are completed while the plant runs on its existing supply, and the switchover is sequenced outside production hours. We have done this on live industrial sites in both Hamriyah Free Zone and SAIF Zone.
Do you handle HFZA EHS electrical inspection requirements?
Yes. We prepare the documentation HFZA EHS requires for the electrical scope and attend the inspections alongside the SEWA inspection.
Do you also do fire alarm and fire fighting in Hamriyah Free Zone?
Yes. Midas is Sharjah Civil Defence approved for fire fighting and fire alarm. See our fire fighting contractor in Hamriyah Free Zone and fire system AMC in Hamriyah Free Zone pages.